Capital Cost

Overview
- Department
- Fire
- Project Number
- F-27-002
- Contact
- Assistant Fire Chief
- Type
- Equipment
- Category
- Equipment Replacement
- Priority
- 1 Critical
- Status
- Active
- Useful Life
- 15 years
Project Description
Replacement of the current high and low pressure air lifting bag systems used for vehicle / machinery extrication and heavy rescue operations. Current inventory includes: (2) 7.4 ton capacity medium pressure lifting bags with a max lifting height of 24" each, (3) 49.1 ton capacity high pressure lifting bags with a max lifting height of 6.7" each, (3) 23.2 ton capacity high pressure lifting bags with a max lifting height of 6.7" each, and the associated pressure regulators, controllers, and air hoses. Both the manufacturer and NFPA 1936 Standard on Rescue Tools state that the lifting bags useful service life is 15 years. The medium pressure bags were purchased in 2008, and the high pressure bags were purchased in 2012. The current equipment has surpassed or reached the end of its service life in accordance with the manufacturer and industry best practices.
Staff proposes replacement of the lifting bag equipment inventory with (2) "MultiForce" 31 ton capacity medium pressure lifting bags with a max lifting height of 26" inches each, (2) "MaxiForce" 44.6 ton capacity high pressure lifting bags with a max lifting height of 13.0" each, (2) "MaxiForce" 39.8 ton capacity high pressure lifting bags with a max lifting height of 11.8" each, and (2) "MaxiForce" 29.8 ton capacity high pressure lifting bags with a max lifting height of 10.8" each, and the associated pressure regulators, controllers, and air hoses which are interoperable between all lifting bag sizes and capacities.
Evolutions in equipment design, as well as our agency's staffing / deployment model and risk levels prompted significant analysis regarding this proposal which mirrors the number and approximate size of the end-of-life equipment while increasing capability and operational flexibility. The proposal would allow for each staffed engine company to be equipped with (1) medium pressure, and a set of 3 high pressure lifting bags and all associated control equipment, where as the previous inventory had to be housed on one apparatus due to incompatibility between medium and high pressure hoses and control equipment.
Project Justification
This equipment is necessary to safely lift, shift, and stabilize vehicles, machinery, and other heavy objects in which people become trapped, entangled, or crushed by. These types of incidents are high-risk / low-frequency and time sensitive in nature categorizing them as some of the most critical we train for and respond to. It is of paramount importance that the equipment utiilzed in these types of incident circumstances perform consistently and as designed in order to minimize the risk to patients and responders.
The current equipment has reached or exceeded its useful service life. The proposal provides for an equivalent quantity of replacement equipment that provides additional lifting capacity and flexibility for distribution across two pieces of fire apparatus ensuring response reliability as service demand, interstate traffic, and incident frequency and risk increase commensurately. Additionally, staff is recommending authorization to sole-source this equipment in order to maintain interoperability with Paratech rescue equipment (stabilization struts) currently utilzed by our agency and neighboring automatic and mutual aid partners with technical rescue capabilities. Staff determined this equipment is available through an existing contract (expiring 2028) on with the GSA group purchasing cooperative at a 7% reduced price from the manufacturer provided quote.
Spend
| Expenditures | 2027 | Total |
|---|---|---|
| No Name | 40,000 | 40,000 |
| Total | 40,000 | 40,000 |
| Funding Sources | 2027 | Total |
|---|---|---|
| General Equipment Replacement Fund | 40,000 | 40,000 |
| Total | 40,000 | 40,000 |