Annual Pavement Maintenance Program

Share your feedback

Do you have thoughts or questions about Annual Pavement Maintenance Program? Your feedback goes directly to Grand Chute, Wisconsin staff — it is never posted on this website.

Capital Cost

TOTAL PROJECT COST$3,310,000

Overview

Department
Streets
Project Number
PWSTR-27-008
Type
Maintenance
Category
Overlays
Priority
2 Very Important
Status
Active
Useful Life
15 years
Paser Rating:
4
Project Length (mi.):
0.10
Budget Items
Budget Items20272028202920302031Total
Street Overlays/Reclamations625,000645,000660,000680,000700,0003,310,000
Total625,000645,000660,000680,000700,0003,310,000

Project Description

Annual preventative maintenance of Town asphalt roadways through partial mill and overlay treatments. Roadways will be selected annually based on pavement condition information, with priority given to streets generally rated 5–6 on the PASER scale. These roadways show moderate deterioration but remain structurally sound, making them good candidates for preventative maintenance.

Work typically includes milling the existing pavement surface, completing localized repairs as needed, and placing a new asphalt overlay. These improvements restore ride quality, protect the pavement structure from moisture infiltration, and slow further deterioration.

Project Justification

Pavement maintenance is a cost-effective strategy to extend the service life of the Town’s roadway network and reduce long-term maintenance costs. Industry pavement management practices show that preventative maintenance performed on roads in fair-to-good condition can extend pavement life by approximately 10–15 years and delay the need for more costly rehabilitation or reconstruction.

Roadways with PASER ratings of 5–6 are at an ideal point for preservation treatments. Addressing pavement conditions before significant structural failures occur allows the Town to maintain more roadway miles each year and maximize the value of existing infrastructure investments. Timely maintenance also helps avoid the accelerated deterioration and substantially higher costs associated with deferred repairs.

This program supports responsible asset management by preserving roadway conditions, improving ride quality and safety, and minimizing the long-term lifecycle cost of the Town’s transportation system.

Spend

Budget Utilization
$3,310,000 of $3,310,000 Actual Spent100%
Expenditures
Expenditures20272028202920302031Total
Construction625,000645,000660,000680,000700,0003,310,000
Total625,000645,000660,000680,000700,0003,310,000
Funding Sources
Funding Sources20272028202920302031Total
Wheel Tax625,000645,000660,000680,000700,0003,310,000
Total625,000645,000660,000680,000700,0003,310,000