Capital Cost
Overview
- Department
- Streets
- Project Number
- PWSTR-27-008
- Type
- Maintenance
- Category
- Overlays
- Priority
- 2 Very Important
- Status
- Active
- Useful Life
- 15 years
- Paser Rating:
- 4
- Project Length (mi.):
- 0.10
| Budget Items | 2027 | 2028 | 2029 | 2030 | 2031 | Total |
|---|---|---|---|---|---|---|
| Street Overlays/ | 625,000 | 645,000 | 660,000 | 680,000 | 700,000 | 3,310,000 |
| Total | 625,000 | 645,000 | 660,000 | 680,000 | 700,000 | 3,310,000 |
Project Description
Annual preventative maintenance of Town asphalt roadways through partial mill and overlay treatments. Roadways will be selected annually based on pavement condition information, with priority given to streets generally rated 5–6 on the PASER scale. These roadways show moderate deterioration but remain structurally sound, making them good candidates for preventative maintenance.
Work typically includes milling the existing pavement surface, completing localized repairs as needed, and placing a new asphalt overlay. These improvements restore ride quality, protect the pavement structure from moisture infiltration, and slow further deterioration.
Project Justification
Pavement maintenance is a cost-effective strategy to extend the service life of the Town’s roadway network and reduce long-term maintenance costs. Industry pavement management practices show that preventative maintenance performed on roads in fair-to-good condition can extend pavement life by approximately 10–15 years and delay the need for more costly rehabilitation or reconstruction.
Roadways with PASER ratings of 5–6 are at an ideal point for preservation treatments. Addressing pavement conditions before significant structural failures occur allows the Town to maintain more roadway miles each year and maximize the value of existing infrastructure investments. Timely maintenance also helps avoid the accelerated deterioration and substantially higher costs associated with deferred repairs.
This program supports responsible asset management by preserving roadway conditions, improving ride quality and safety, and minimizing the long-term lifecycle cost of the Town’s transportation system.
Spend
| Expenditures | 2027 | 2028 | 2029 | 2030 | 2031 | Total |
|---|---|---|---|---|---|---|
| Construction | 625,000 | 645,000 | 660,000 | 680,000 | 700,000 | 3,310,000 |
| Total | 625,000 | 645,000 | 660,000 | 680,000 | 700,000 | 3,310,000 |
| Funding Sources | 2027 | 2028 | 2029 | 2030 | 2031 | Total |
|---|---|---|---|---|---|---|
| Wheel Tax | 625,000 | 645,000 | 660,000 | 680,000 | 700,000 | 3,310,000 |
| Total | 625,000 | 645,000 | 660,000 | 680,000 | 700,000 | 3,310,000 |