Grand Chute, Wisconsin
Grand Chute, Wisconsin

Bluemound Dr Relay (College-Wisconsin)

Powered by PlanIt!

Capital Cost

TOTAL PROJECT COST$3,906,830

Overview

DepartmentSanitary District 1 - Water
Project NumberPWS1-25-002
TypeImprovement
CategoryWater
Priority1 Critical
StatusActive
Useful Life75 years
Budget Items2026Total
Water - Sanitary District No. 13,690,0003,690,000
Total3,690,0003,690,000

Project Description

Replacement of existing water main along Bluemound Dr between College Ave and Wisconsin Ave.  Also includes replacement of water main along Highview Dr on either side of Bluemound Dr, Lilas Dr (Highview Dr-College), Franklin St (Lilas Dr-Termini), Woodman Dr (Bluemound Ct-Bluemound Dr), and Bluemound Ct (Woodman Dr-Termini).  Existing sanitary sewer will be televised and reviewed for any repairs required.

Project Justification

Corrosive soils have deteriorated the existing ductile iron water main, which was installed in approximately year 1975. The Town desires to reduce water loss associated with leaks and water main breaks. Both leaks and breaks contribute to water loss in the Town.

Spend

PriorExpenditures2026Total
216,830Construction3,690,0003,690,000
Total3,690,0003,690,000
PriorFunding Sources2026Total
216,830San 1 Debt3,690,0003,690,000
Total3,690,0003,690,000