College Ave Relay (I-41-Misty Tower)

Powered by PlanIt!

Capital Cost

TOTAL PROJECT COST$2,115,000

Overview

DepartmentSanitary District 1 - Water
Project NumberPWS1-26-004
TypeImprovement
CategoryWater
Priority1 Critical
StatusActive
Useful Life75 years
Budget Items2030Total
Water - Sanitary District No. 1155,000155,000
Total155,000155,000

Project Description

Replacement of the existing 16" ductile iron water main along College Ave (I-41-Misty Tower).

Project Justification

Corrosive soils have deteriorated the existing ductile iron water main, which was installed in approximately year 1975. The Town desires to reduce water loss associated with leaks and water main breaks. Both leaks and breaks contribute to water loss in the Town.

Spend

Expenditures2030TotalFuture
Engineering155,000155,0001,960,000
Total155,000155,000
Funding Sources2030TotalFuture
San 1 Debt155,000155,0001,960,000
Total155,000155,000