College Ave Relay (I-41-Misty Tower)

Share your feedback

Do you have thoughts or questions about College Ave Relay (I-41-Misty Tower)? Your feedback goes directly to Grand Chute, Wisconsin staff — it is never posted on this website.

Capital Cost

TOTAL PROJECT COST$2,235,000

Overview

Department
Sanitary District 1 - Water
Project Number
PWS1-26-004
Type
Improvement
Category
Water
Priority
1 Critical
Status
Active
Useful Life
75 years
Budget Items
Budget Items20302031Total
Water - Sanitary District No. 1165,0002,070,0002,235,000
Total165,0002,070,0002,235,000

Project Description

Replacement of the existing 16" ductile iron water main along College Ave (I-41-Misty Tower).

Project Justification

Corrosive soils have deteriorated the existing ductile iron water main, which was installed in approximately year 1975. The Town desires to reduce water loss associated with leaks and water main breaks. Both leaks and breaks contribute to water loss in the Town.

Spend

Budget Utilization
$2,235,000 of $2,235,000 Actual Spent100%
  • Construction - $2,070,000 (92.6%)
  • Engineering - $165,000 (7.4%)
Expenditures
Expenditures20302031Total
Construction02,070,0002,070,000
Engineering165,0000165,000
Total165,0002,070,0002,235,000
Funding Sources
Funding Sources20302031Total
San 1 Debt165,0002,070,0002,235,000
Total165,0002,070,0002,235,000