Share your feedback
Do you have thoughts or questions about Glendale Ave Bridge Replacement? Your feedback goes directly to Grand Chute, Wisconsin staff — it is never posted on this website.
Capital Cost
Overview
- Department
- Sanitary District 3 - Storm
- Project Number
- PWS3-27-003
- Type
- Improvement
- Category
- Bridges
- Priority
- 2 Very Important
- Status
- Active
- Useful Life
- 75 years years
- Paser Rating:
- NA
- Project Length (mi.):
- NA
| Budget Items | 2027 | 2028 | Total |
|---|---|---|---|
| Storm - Sanitary District No. 3 | 110,000 | 770,000 | 880,000 |
| Total | 110,000 | 770,000 | 880,000 |
Project Description
Replace existing bridge structure (P-44-144) with a single-span bridge structure.
Project Justification
The existing structure is a double steel culvert run with corrosion present in both culverts along the waterline. There are multiple wooden support posts present within the east culvert. These posts have a history of creating flow blockages that then need to be removed by the Town. One sanitary manhole on the south side of Glendale Ave. will require adjustment based on final pavement grades. The depth of the existing water main is unknown beneath the current structure; it will be assumed that beneath the new structure, the existing water main will need to be lowered to account for any over excavation or new structural elements.
Spend
- Construction - $770,000 (87.5%)
- Engineering - $110,000 (12.5%)
| Expenditures | 2027 | 2028 | Total |
|---|---|---|---|
| Construction | 0 | 770,000 | 770,000 |
| Engineering | 110,000 | 0 | 110,000 |
| Total | 110,000 | 770,000 | 880,000 |
| Funding Sources | 2027 | 2028 | Total |
|---|---|---|---|
| San 3 Fund Balance | 110,000 | 770,000 | 880,000 |
| Total | 110,000 | 770,000 | 880,000 |