Grand Chute, WisconsinGrand Chute, Wisconsin

Glendale Ave Bridge Replacement

Share your feedback

Do you have thoughts or questions about Glendale Ave Bridge Replacement? Your feedback goes directly to Grand Chute, Wisconsin staff — it is never posted on this website.

Capital Cost

TOTAL PROJECT COST$880,000

Overview

Department
Sanitary District 3 - Storm
Project Number
PWS3-27-003
Type
Improvement
Category
Bridges
Priority
2 Very Important
Status
Active
Useful Life
75 years years
Paser Rating:
NA
Project Length (mi.):
NA
Budget Items
Budget Items20272028Total
Storm - Sanitary District No. 3110,000770,000880,000
Total110,000770,000880,000

Project Description

Replace existing bridge structure (P-44-144) with a single-span bridge structure.

Project Justification

The existing structure is a double steel culvert run with corrosion present in both culverts along the waterline.  There are multiple wooden support posts present within the east culvert.  These posts have a history of creating flow blockages that then need to be removed by the Town.  One sanitary manhole on the south side of Glendale Ave. will require adjustment based on final pavement grades.  The depth of the existing water main is unknown beneath the current structure; it will be assumed that beneath the new structure, the existing water main will need to be lowered to account for any over excavation or new structural elements.

Spend

Budget Utilization
$880,000 of $880,000 Actual Spent100%
  • Construction - $770,000 (87.5%)
  • Engineering - $110,000 (12.5%)
Expenditures
Expenditures20272028Total
Construction0770,000770,000
Engineering110,0000110,000
Total110,000770,000880,000
Funding Sources
Funding Sources20272028Total
San 3 Fund Balance110,000770,000880,000
Total110,000770,000880,000