Grand Chute, WisconsinGrand Chute, Wisconsin

Greves Lift Station Rehabilitation

Share your feedback

Do you have thoughts or questions about Greves Lift Station Rehabilitation? Your feedback goes directly to Grand Chute, Wisconsin staff — it is never posted on this website.

Capital Cost

TOTAL PROJECT COST$870,000

Overview

Department
Sanitary District 2 - Sewer
Project Number
PWS2-26-008
Type
Improvement
Category
Wastewater
Priority
2 Very Important
Status
Active
Useful Life
75 years years
Budget Items
Budget Items20302031Total
Sewer - Sanitary District No. 250,000820,000870,000
Total50,000820,000870,000

Project Description

Rehabilitation of the Greves Lift Station with an at-grade lift station.  Includes removal of can, pump and interior piping replacement, and new valve chamber to eliminate confined space.  Pumps, base elbows, guide rails, and guide shoes require sooner replacement.

Project Justification

In 2023, the Town contracted with AECOM to perform a condition assessment of all Town-owned sanitary sewer lift stations.  Greves Lift Station is a can station that was constructed in 1984 and rehabilitated in 2006.  This station is generally in poor to fair condition.  Maintenance access is very challenging since the pumps are submersible and installed below the can, with guide rails mounted to the discharge piping, which terminate below the floor of the can.

Spend

Budget Utilization
$870,000 of $870,000 Actual Spent100%
Expenditures
Expenditures20302031Total
Construction50,000820,000870,000
Total50,000820,000870,000
Funding Sources
Funding Sources20302031Total
San 2 Fund Balance50,000820,000870,000
Total50,000820,000870,000