Grand Chute, WisconsinGrand Chute, Wisconsin

Heritage Lift Station Rehabilitation

Share your feedback

Do you have thoughts or questions about Heritage Lift Station Rehabilitation? Your feedback goes directly to Grand Chute, Wisconsin staff — it is never posted on this website.

Capital Cost

TOTAL PROJECT COST$870,000

Overview

Department
Sanitary District 2 - Sewer
Project Number
PWS2-28-001
Type
Improvement
Category
Wastewater
Priority
2 Very Important
Status
Active
Useful Life
50 years years
Paser Rating:
N/A
Project Length (mi.):
N/A
Budget Items
Budget Items20302031Total
Sewer - Sanitary District No. 250,000820,000870,000
Total50,000820,000870,000

Project Description

Rehabilitation of the Heritage Lift Station with an at-grade lift station.  Includes removal of can, pump and interior piping replacement, and new valve chamber to eliminate confined space.

Project Justification

In 2023 the Town contracted with AECOM to perform a condition assessment of all Town owned sanitary sewer lift stations.  The assessment of the Heritage Lift Station resulted in a recommendation to remove the can, replace pumps and interior piping, install new valve chamber to eliminate confined space.  Drawdown testing performed during the site visit indicated that Pumps No. 1 and 2 were at 55% and 71% of their rated capacity, respectively.  There is observed corrosion on the valves and piping in the can, in the metal entrance to the wet well, and the piping and bracing in the wet well.  There are two leaks infiltration from the inlet joints in the wet well on the SE side forming deposits.

Spend

Budget Utilization
$870,000 of $870,000 Actual Spent100%
  • Construction - $820,000 (94.3%)
  • Engineering - $50,000 (5.7%)
Expenditures
Expenditures20302031Total
Construction0820,000820,000
Engineering50,000050,000
Total50,000820,000870,000
Funding Sources
Funding Sources20302031Total
San 2 Fund Balance50,000820,000870,000
Total50,000820,000870,000