Grand Chute, WisconsinGrand Chute, Wisconsin

Highland Heights Subdivision Urban Recondition

Share your feedback

Do you have thoughts or questions about Highland Heights Subdivision Urban Recondition? Your feedback goes directly to Grand Chute, Wisconsin staff — it is never posted on this website.

Capital Cost

TOTAL PROJECT COST$1,375,000

Overview

Department
Streets
Project Number
PWSTR-27-004
Type
Improvement
Category
Reconstruction
Priority
2 Very Important
Status
Active
Useful Life
20 years years
Paser Rating:
3
Project Length (mi.):
0.20
  • Street Overlays/Reclamations - $644,000 (46.8%)
  • Water - Sanitary District No. 1 - $569,000 (41.4%)
  • Storm - Sanitary District No. 3 - $60,000 (4.4%)
  • Engineering Streets - $52,000 (3.8%)
  • Sewer - Sanitary District No. 2 - $50,000 (3.6%)
Budget Items
Budget Items20292030Total
Engineering Streets52,000052,000
Sewer - Sanitary District No. 2050,00050,000
Storm - Sanitary District No. 3060,00060,000
Street Overlays/Reclamations0644,000644,000
Water - Sanitary District No. 10569,000569,000
Total52,0001,323,0001,375,000

Project Description

The following roadways will be reconditioned: W Woodstone Dr (N Mason St-N Spruce St), N Spruce St (W Woodstone Dr-W Capitol Dr), W Deerwood Ct (N Spruce St-Termini), W Cherrywood Ct (W Spruce St-Termini), and W Cottonwood Ct (N Spruce St-Termini). Project will include isolated base course repairs, curb & gutter repairs, storm sewer inlet and manhole repairs. Water main hardware and bolts to be replaced on tees and valves. Hydrants and copper services to be replaced. Sanitary manhole to be adjusted to final grade.

Project Justification

Pavement is in poor condition and is beginning to deteriorate. Existing water main was likely installed without stainless steel hardware and bolts, as well as having copper services that have a history of corroding.

Spend

Budget Utilization
$1,375,000 of $1,375,000 Actual Spent100%
  • Construction - $1,323,000 (96.2%)
  • Engineering - $52,000 (3.8%)
Expenditures
Expenditures20292030Total
Construction01,323,0001,323,000
Engineering52,000052,000
Total52,0001,323,0001,375,000
  • General Obligation Debt - $696,000 (50.6%)
  • San 1 Debt - $569,000 (41.4%)
  • San 3 Fund Balance - $60,000 (4.4%)
  • SAN 2 Debt - $50,000 (3.6%)
Funding Sources
Funding Sources20292030Total
General Obligation Debt52,000644,000696,000
San 1 Debt0569,000569,000
SAN 2 Debt050,00050,000
San 3 Fund Balance060,00060,000
Total52,0001,323,0001,375,000