Share your feedback
Do you have thoughts or questions about Meadowbrook Subdivision Reclaim/Pave? Your feedback goes directly to Grand Chute, Wisconsin staff — it is never posted on this website.
Capital Cost
Overview
- Department
- Streets
- Project Number
- PWSTR-27-003
- Type
- Improvement
- Category
- Reclamation
- Priority
- 2 Very Important
- Status
- Active
- Useful Life
- 20 years years
- Paser Rating:
- 3
- Project Length (mi.):
- .20
- Street Overlays/Reclamations - $795,000 (42.4%)
- Water - Sanitary District No. 1 - $496,000 (26.5%)
- Storm - Sanitary District No. 3 - $438,000 (23.4%)
- Engineering Streets - $74,000 (3.9%)
- Sewer - Sanitary District No. 2 - $72,000 (3.8%)
| Budget Items | 2028 | 2029 | Total |
|---|---|---|---|
| Engineering Streets | 74,000 | 0 | 74,000 |
| Sewer - Sanitary District No. 2 | 0 | 72,000 | 72,000 |
| Storm - Sanitary District No. 3 | 0 | 438,000 | 438,000 |
| Street Overlays/ | 0 | 795,000 | 795,000 |
| Water - Sanitary District No. 1 | 0 | 496,000 | 496,000 |
| Total | 74,000 | 1,801,000 | 1,875,000 |
Project Description
The following roadways will be reclaimed and paved: Meadowbrook Ct (S Bluemound Dr-Meadowbrook Ct) and Meadowbrook Ln (S Bluemound Dr-Meadowbrook Ct). Isolated ditch improvements will be evaluated and improved where necessary. Culverts will be reviewed and replaced if needed. Water main hardware and bolts to be replaced on tees and valves. Hydrants and copper services to be replaced. Sanitary manhole to be adjusted to final grade.
Project Justification
Roadway surface is deteriorating and is past pavement maintenance/preservation methods. Existing water main was likely installed without stainless steel hardware and bolts, as well as having copper services that have a history of corroding.
Spend
- Construction - $1,801,000 (96.1%)
- Engineering - $74,000 (3.9%)
| Expenditures | 2028 | 2029 | Total |
|---|---|---|---|
| Construction | 0 | 1,801,000 | 1,801,000 |
| Engineering | 74,000 | 0 | 74,000 |
| Total | 74,000 | 1,801,000 | 1,875,000 |
- General Obligation Debt - $869,000 (46.3%)
- San 1 Debt - $496,000 (26.5%)
- San 3 Fund Balance - $438,000 (23.4%)
- SAN 2 Debt - $72,000 (3.8%)
| Funding Sources | 2028 | 2029 | Total |
|---|---|---|---|
| General Obligation Debt | 74,000 | 795,000 | 869,000 |
| San 1 Debt | 0 | 496,000 | 496,000 |
| SAN 2 Debt | 0 | 72,000 | 72,000 |
| San 3 Fund Balance | 0 | 438,000 | 438,000 |
| Total | 74,000 | 1,801,000 | 1,875,000 |