Grand Chute, WisconsinGrand Chute, Wisconsin

N Hickory Farm Lane Pond Dredging

Share your feedback

Do you have thoughts or questions about N Hickory Farm Lane Pond Dredging? Your feedback goes directly to Grand Chute, Wisconsin staff — it is never posted on this website.

Capital Cost

TOTAL PROJECT COST$153,000

Overview

Department
Sanitary District 3 - Storm
Project Number
PWS3-27-002
Type
Improvement
Category
Storm Sewer/Drainage
Priority
2 Very Important
Status
Active
Useful Life
30 years
Paser Rating:
NA
Project Length (mi.):
NA
Budget Items
Budget Items20272028Total
Storm - Sanitary District No. 310,000143,000153,000
Total10,000143,000153,000

Project Description

Dredge and restore two Town-owned stormwater ponds and replant surrounding areas with native prairie.

Project Justification

The existing ponds have accumulated sediment buildup that is contributing to a significant loss in stormwater storage capacity.  The ponds are also overgrown with vegetation and have shoreline erosion that needs to be addressed.  Dredging will remove the sediment and improve water quality, while stabilizing the pond slopes will help prevent future erosion.  Planting the slopes with native prairie will also significantly reduce long-term maintenance by limiting mowing and chemical usage.

Spend

Budget Utilization
$153,000 of $153,000 Actual Spent100%
  • Construction - $143,000 (93.5%)
  • Engineering - $10,000 (6.5%)
Expenditures
Expenditures20272028Total
Construction0143,000143,000
Engineering10,000010,000
Total10,000143,000153,000
Funding Sources
Funding Sources20272028Total
San 3 Fund Balance10,000143,000153,000
Total10,000143,000153,000