Capital Cost
Overview
- Department
- Sanitary District 3 - Storm
- Project Number
- PWS3-27-002
- Type
- Improvement
- Category
- Storm Sewer/Drainage
- Priority
- 2 Very Important
- Status
- Active
- Useful Life
- 30 years
- Paser Rating:
- NA
- Project Length (mi.):
- NA
| Budget Items | 2027 | 2028 | Total |
|---|---|---|---|
| Storm - Sanitary District No. 3 | 10,000 | 143,000 | 153,000 |
| Total | 10,000 | 143,000 | 153,000 |
Project Description
Dredge and restore two Town-owned stormwater ponds and replant surrounding areas with native prairie.
Project Justification
The existing ponds have accumulated sediment buildup that is contributing to a significant loss in stormwater storage capacity. The ponds are also overgrown with vegetation and have shoreline erosion that needs to be addressed. Dredging will remove the sediment and improve water quality, while stabilizing the pond slopes will help prevent future erosion. Planting the slopes with native prairie will also significantly reduce long-term maintenance by limiting mowing and chemical usage.
Spend
- Construction - $143,000 (93.5%)
- Engineering - $10,000 (6.5%)
| Expenditures | 2027 | 2028 | Total |
|---|---|---|---|
| Construction | 0 | 143,000 | 143,000 |
| Engineering | 10,000 | 0 | 10,000 |
| Total | 10,000 | 143,000 | 153,000 |
| Funding Sources | 2027 | 2028 | Total |
|---|---|---|---|
| San 3 Fund Balance | 10,000 | 143,000 | 153,000 |
| Total | 10,000 | 143,000 | 153,000 |