N Mayflower Dr (STH 96-CTH GV)

Share your feedback

Do you have thoughts or questions about N Mayflower Dr (STH 96-CTH GV)? Your feedback goes directly to Grand Chute, Wisconsin staff — it is never posted on this website.

Capital Cost

TOTAL PROJECT COST$891,000

Overview

Department
Streets
Project Number
PWSTR-26-006
Type
Improvement
Category
Reclamation
Priority
2 Very Important
Status
Active
Useful Life
25 years
Paser Rating:
3
Project Length (mi.):
0.66
  • Street Overlays/Reclamations - $599,000 (67.2%)
  • Storm - Sanitary District No. 3 - $226,000 (25.4%)
  • Engineering Streets - $66,000 (7.4%)
Budget Items
Budget Items20292031Total
Engineering Streets66,000066,000
Storm - Sanitary District No. 30226,000226,000
Street Overlays/Reclamations0599,000599,000
Total66,000825,000891,000

Project Description

N Mayflower Dr (STH 96-CTH GV) will be reclaimed and paved.  Isolated ditch grading and culvert replacements may occur based on surveyed conditions.

Project Justification

Roadway is beginning to deteriorate and area drainage is poor.  Construction timeline is aligned with potential future intersection improvement project at CTH GV/Mayflower led by County.

Spend

Budget Utilization
$891,000 of $891,000 Actual Spent100%
  • Construction - $825,000 (92.6%)
  • Engineering - $66,000 (7.4%)
Expenditures
Expenditures20292031Total
Construction0825,000825,000
Engineering66,000066,000
Total66,000825,000891,000
  • General Obligation Debt - $665,000 (74.6%)
  • San 3 Fund Balance - $226,000 (25.4%)
Funding Sources
Funding Sources20292031Total
General Obligation Debt66,000599,000665,000
San 3 Fund Balance0226,000226,000
Total66,000825,000891,000