Capital Cost
TOTAL PROJECT COST$1,900,000
Overview
- Department
- Sanitary District 1 - Water
- Project Number
- PWS1-26-003
- Type
- Improvement
- Category
- Water
- Priority
- 1 Critical
- Status
- Active
- Useful Life
- 75 years
| Budget Items | 2031 | Total |
|---|---|---|
| Water - Sanitary District No. 1 | 140,000 | 140,000 |
| Total | 140,000 | 140,000 |
Project Description
Replacement of existing water main along S Lilas Dr (College-Lawrence), S Lilas Dr (Spencer-Booster 1), and W Lawrence St (Bluemound-Lynndale). Existing sanitary sewer will be televised and reviewed for any repairs required.
Project Justification
Corrosive soils have deteriorated the existing ductile iron water main, which was installed in approximately year 1975. The Town desires to reduce water loss associated with leaks and water main breaks. Both leaks and breaks contribute to water loss in the Town.
Spend
Budget Utilization
$140,000 of $140,000 Actual Spent100%
| Expenditures | 2031 | Total | Future |
|---|---|---|---|
| Engineering | 140,000 | 140,000 | 1,760,000 |
| Total | 140,000 | 140,000 |
| Funding Sources | 2031 | Total | Future |
|---|---|---|---|
| San 1 Debt | 140,000 | 140,000 | 1,760,000 |
| Total | 140,000 | 140,000 |