Grand Chute, WisconsinGrand Chute, Wisconsin

S Lilas Dr/W Lawrence St Relay

Share your feedback

Do you have thoughts or questions about S Lilas Dr/W Lawrence St Relay? Your feedback goes directly to Grand Chute, Wisconsin staff — it is never posted on this website.

Capital Cost

TOTAL PROJECT COST$1,900,000

Overview

Department
Sanitary District 1 - Water
Project Number
PWS1-26-003
Type
Improvement
Category
Water
Priority
1 Critical
Status
Active
Useful Life
75 years
Budget Items
Budget Items2031Total
Water - Sanitary District No. 1140,000140,000
Total140,000140,000

Project Description

Replacement of existing water main along S Lilas Dr (College-Lawrence), S Lilas Dr (Spencer-Booster 1), and W Lawrence St (Bluemound-Lynndale).  Existing sanitary sewer will be televised and reviewed for any repairs required.

Project Justification

Corrosive soils have deteriorated the existing ductile iron water main, which was installed in approximately year 1975. The Town desires to reduce water loss associated with leaks and water main breaks. Both leaks and breaks contribute to water loss in the Town.

Spend

Budget Utilization
$140,000 of $140,000 Actual Spent100%
Expenditures
Expenditures2031TotalFuture
Engineering140,000140,0001,760,000
Total140,000140,000
Funding Sources
Funding Sources2031TotalFuture
San 1 Debt140,000140,0001,760,000
Total140,000140,000