Grand Chute, WisconsinGrand Chute, Wisconsin

SWITCH INFRASTRUCTURE REPLACEMENT 2027

Share your feedback

Do you have thoughts or questions about SWITCH INFRASTRUCTURE REPLACEMENT 2027? Your feedback goes directly to Grand Chute, Wisconsin staff — it is never posted on this website.

Capital Cost

TOTAL PROJECT COST$80,000

Overview

Department
Information Technology
Project Number
IT-27-001
Contact
IT Director
Type
Equipment
Category
Equipment Replacement
Priority
2 Very Important
Status
Active
Useful Life
9 years

Budget Impact

The budget impact for this project includes a one-time cost of $80,000. This investment in new network switches is expected to result in long-term savings through reduced maintenance costs and improved network efficiency while strengthening our security posture.

Budget Items
Budget Items2027Total
Capital Equipment - IT80,00080,000
Total80,00080,000

Project Justification

Modernizing the network backbone is a foundational requirement for the organization’s cybersecurity posture. The existing switches are no longer capable of supporting current security protocols or high-bandwidth applications. Following a one-year deferral to address other priorities, this project is now a critical necessity to address technical debt, close potential security vulnerabilities, and provide the robust infrastructure required for 2027 technology standards.

Project Description

This project aims to replace the swich infrastructure that provides network connectivity to all locations and devices.  Originally slated for 2026, those funds were allocated to a more pressing project and this project looks at completion now in 2027.

Spend

Expenditures
Expenditures2027Total
Other80,00080,000
Total80,00080,000
  • IT Infrastructure Replacement Fund - $56,000 (70.0%)
  • San 1 Fund Balance - $8,000 (10.0%)
  • San 2 Fund Balance - $8,000 (10.0%)
  • San 3 Fund Balance - $8,000 (10.0%)
Funding Sources
Funding Sources2027Total
IT Infrastructure Replacement Fund56,00056,000
San 1 Fund Balance8,0008,000
San 2 Fund Balance8,0008,000
San 3 Fund Balance8,0008,000
Total80,00080,000