Capital Cost

TOTAL PROJECT COST$1,536,000

Overview

Department
Streets
Project Number
PWSTR-25-012
Type
Improvement
Category
Reclamation
Priority
3 Important
Status
Active
Useful Life
20 years
  • Street Overlays/Reclamations - $593,000 (38.6%)
  • Water - Sanitary District No. 1 - $489,000 (31.8%)
  • Storm - Sanitary District No. 3 - $338,000 (22.0%)
  • Engineering Streets - $74,000 (4.8%)
  • Sewer - Sanitary District No. 2 - $42,000 (2.7%)
Budget Items
Budget Items20282029Total
Engineering Streets74,000074,000
Sewer - Sanitary District No. 2042,00042,000
Storm - Sanitary District No. 30338,000338,000
Street Overlays/Reclamations0593,000593,000
Water - Sanitary District No. 121,000468,000489,000
Total95,0001,441,0001,536,000

Project Description

The following roadways will be reclaimed and paved: S Timmers Ln (W Spencer St-Termini) and S Kools Ct (W Spencer St-Termini) . Isolated ditch improvements will be evaluated and improved where necessary. Water main to be replaced on Kools Ct.  Water main hardware to be replaced on Timmers Ln if in poor condition. Sanitary manhole to be adjusted to final grade. Culverts will be reviewed and replaced if needed.

Project Justification

Roadway surface is deteriorating and is past pavement maintenance/preservation methods. Project will include replacement of bolts for water valves and hydrants.  Corrosive soils have deteriorated the existing ductile iron water main. The Town desires to reduce water loss associated with leaks and water main breaks. Both leaks and breaks contribute to water loss in the Town.

Spend

Budget Utilization
$1,536,000 of $1,536,000 Actual Spent100%
  • Construction - $1,441,000 (93.8%)
  • Engineering - $95,000 (6.2%)
Expenditures
Expenditures20282029Total
Construction01,441,0001,441,000
Engineering95,000095,000
Total95,0001,441,0001,536,000
  • General Obligation Debt - $667,000 (43.4%)
  • San 1 Debt - $489,000 (31.8%)
  • San 3 Fund Balance - $338,000 (22.0%)
  • San 2 Fund Balance - $42,000 (2.7%)
Funding Sources
Funding Sources20282029Total
General Obligation Debt74,000593,000667,000
San 1 Debt21,000468,000489,000
San 2 Fund Balance042,00042,000
San 3 Fund Balance0338,000338,000
Total95,0001,441,0001,536,000