Capital Cost

TOTAL PROJECT COST$1,035,000

Overview

Department
Sanitary District 2 - Sewer
Project Number
PWS2-27-001
Type
Improvement
Category
Wastewater
Priority
2 Very Important
Status
Active
Useful Life
75 years years
Budget Items
Budget Items20292030Total
Sewer - Sanitary District No. 260,000975,0001,035,000
Total60,000975,0001,035,000

Project Description

Rehabilitation of the Tri Park Lift Station with an at-grade lift station.  Includes removal of can, pump and interior piping replacement, and new valve chamber to eliminate confined space.

Project Justification

In 2023, the Town contracted with AECOM to perform a condition assessment of all Town-owned sanitary sewer lift stations.  The assessment of the Tri Park Lift Station indicated that the lift station should be replaced within the next 5 years.  Tri Park Lift Station is a can station that was constructed in 1986.  A retrofit project was completed in 2010 to replace the pumps and controls.  This station is generally in poor condition.  Maintenance access is very challenging since the pumps are submersible and installed below the can, with guide rails mounted to the discharge piping, which terminate below the floor of the can. There is significant corrosion on the metal can and wet well piping.

Spend

Budget Utilization
$1,035,000 of $1,035,000 Actual Spent100%
  • Construction - $975,000 (94.2%)
  • Engineering - $60,000 (5.8%)
Expenditures
Expenditures20292030Total
Construction0975,000975,000
Engineering60,000060,000
Total60,000975,0001,035,000
Funding Sources
Funding Sources20292030Total
San 2 Fund Balance60,000975,0001,035,000