Capital Cost
Overview
- Department
- Sanitary District 2 - Sewer
- Project Number
- PWS2-27-001
- Type
- Improvement
- Category
- Wastewater
- Priority
- 2 Very Important
- Status
- Active
- Useful Life
- 75 years years
| Budget Items | 2029 | 2030 | Total |
|---|---|---|---|
| Sewer - Sanitary District No. 2 | 60,000 | 975,000 | 1,035,000 |
| Total | 60,000 | 975,000 | 1,035,000 |
Project Description
Rehabilitation of the Tri Park Lift Station with an at-grade lift station. Includes removal of can, pump and interior piping replacement, and new valve chamber to eliminate confined space.
Project Justification
In 2023, the Town contracted with AECOM to perform a condition assessment of all Town-owned sanitary sewer lift stations. The assessment of the Tri Park Lift Station indicated that the lift station should be replaced within the next 5 years. Tri Park Lift Station is a can station that was constructed in 1986. A retrofit project was completed in 2010 to replace the pumps and controls. This station is generally in poor condition. Maintenance access is very challenging since the pumps are submersible and installed below the can, with guide rails mounted to the discharge piping, which terminate below the floor of the can. There is significant corrosion on the metal can and wet well piping.
Spend
- Construction - $975,000 (94.2%)
- Engineering - $60,000 (5.8%)
| Expenditures | 2029 | 2030 | Total |
|---|---|---|---|
| Construction | 0 | 975,000 | 975,000 |
| Engineering | 60,000 | 0 | 60,000 |
| Total | 60,000 | 975,000 | 1,035,000 |
| Funding Sources | 2029 | 2030 | Total |
|---|---|---|---|
| San 2 Fund Balance | 60,000 | 975,000 | 1,035,000 |
| Total | 60,000 | 975,000 | 1,035,000 |