Grand Chute, Wisconsin
Grand Chute, Wisconsin

W Brewster St (Bluemound-Lynndale Frontage Rd)

Powered by PlanIt!

Capital Cost

TOTAL PROJECT COST$2,593,000

Overview

DepartmentStreets
Project NumberPWSTR-25-009
TypeImprovement
CategoryReconstruction
Priority2 Very Important
StatusActive
Useful Life20 years years
Paser Rating:6
Project Length (mi.):0.25
Budget Items20292030Total
Engineering Streets135,0000135,000
Sewer - Sanitary District No. 20424,000424,000
Storm - Sanitary District No. 310,0000427,000
Street Overlays/Reclamations01,290,0001,290,000
Water - Sanitary District No. 10317,000317,000
Total145,0002,031,0002,593,000

Project Description

W Brewster St (Bluemound-Lilas) will have a full depth mill and overlay of the existing roadway pavement. It will include constructing a 5' sidewalk south of roadway between Popp Ln and Lilas Dr to provide connectivity to existing sidewalk to the west.  Curb & gutter will be spot repaired.  Water main will have hardware replaced and hydrants/valves evaluated.  Sanitary sewer will be reviewed and replaced as needed.

W Brewster St (Lilas-Lynndale Frontage Rd) is planned to be urbanized with curb and gutter and storm sewer. Construct 5' sidewalk south of roadway to provide connectivity to existing pedestrian facilities.  Sanitary sewer will be reviewed and replaced as needed. Water main will have hardware replaced and hydrants/valves evaluated.

N Rexford St (W Darling St-W Brewster St) will be reclaimed and paved as part of this project.

Project Justification

Roadway is in poor condition. Drainage is poor. No bike/ped facilities are present.

Spend

Expenditures20292030Total
Construction02,448,0002,448,000
Engineering145,0000145,000
Total145,0002,448,0002,593,000
Funding Sources20292030Total
General Obligation Debt 203001,290,0001,425,000
San 1 Debt0317,000317,000
San 2 Fund Balance0424,000424,000
San 3 Fund Balance0417,000427,000
Total02,448,0002,593,000