Share your feedback
Do you have thoughts or questions about W Brewster St (Bluemound-Lynndale Frontage Rd)? Your feedback goes directly to Grand Chute, Wisconsin staff — it is never posted on this website.
Capital Cost
Overview
- Department
- Streets
- Project Number
- PWSTR-25-009
- Type
- Improvement
- Category
- Reconstruction
- Priority
- 2 Very Important
- Status
- Active
- Useful Life
- 20 years years
- Paser Rating:
- 6
- Project Length (mi.):
- 0.25
- Street Overlays/Reclamations - $1,861,000 (48.5%)
- Storm - Sanitary District No. 3 - $704,000 (18.3%)
- Water - Sanitary District No. 1 - $614,000 (16.0%)
- Sewer - Sanitary District No. 2 - $498,000 (13.0%)
- Engineering Streets - $164,000 (4.3%)
| Budget Items | 2029 | 2031 | Total |
|---|---|---|---|
| Engineering Streets | 164,000 | 0 | 164,000 |
| Sewer - Sanitary District No. 2 | 0 | 498,000 | 498,000 |
| Storm - Sanitary District No. 3 | 10,000 | 694,000 | 704,000 |
| Street Overlays/ | 0 | 1,861,000 | 1,861,000 |
| Water - Sanitary District No. 1 | 0 | 614,000 | 614,000 |
| Total | 174,000 | 3,667,000 | 3,841,000 |
Project Justification
Roadway is in poor condition. Drainage is poor. No bike/ped facilities are present.
Project Description
W Brewster St (Bluemound-Lilas) will have a full depth mill and overlay of the existing roadway pavement. It will include constructing a 5' sidewalk south of roadway between Popp Ln and Lilas Dr to provide connectivity to existing sidewalk to the west. Curb & gutter will be spot repaired. Water main will have hardware replaced and hydrants/valves evaluated. Sanitary sewer will be reviewed and replaced as needed.
W Brewster St (Lilas-Lynndale Frontage Rd) is planned to be urbanized with curb and gutter and storm sewer. Construct 5' sidewalk south of roadway to provide connectivity to existing pedestrian facilities. Sanitary sewer will be reviewed and replaced as needed. Water main will have hardware replaced and hydrants/valves evaluated.
N Hine St (Brewster-Randall), N Rexford St (Brewster-Randall), N Rynders St (Brewster-Randall), E Frontage Rd (Brewster-Randall), and W Randall St (Hines-E Frontage) will be reclaimed and paved as part of this project.
Spend
- Construction - $3,667,000 (95.5%)
- Engineering - $174,000 (4.5%)
| Expenditures | 2029 | 2031 | Total |
|---|---|---|---|
| Construction | 0 | 3,667,000 | 3,667,000 |
| Engineering | 174,000 | 0 | 174,000 |
| Total | 174,000 | 3,667,000 | 3,841,000 |
- General Obligation Debt - $2,025,000 (52.7%)
- San 3 Fund Balance - $704,000 (18.3%)
- San 1 Debt - $614,000 (16.0%)
- SAN 2 Debt - $498,000 (13.0%)
| Funding Sources | 2029 | 2031 | Total |
|---|---|---|---|
| General Obligation Debt | 164,000 | 1,861,000 | 2,025,000 |
| San 1 Debt | 0 | 614,000 | 614,000 |
| SAN 2 Debt | 0 | 498,000 | 498,000 |
| San 3 Fund Balance | 10,000 | 694,000 | 704,000 |
| Total | 174,000 | 3,667,000 | 3,841,000 |