Grand Chute, WisconsinGrand Chute, Wisconsin

W Capitol Drive Urbanization (Capitol FR-Lynndale)

Share your feedback

Do you have thoughts or questions about W Capitol Drive Urbanization (Capitol FR-Lynndale)? Your feedback goes directly to Grand Chute, Wisconsin staff — it is never posted on this website.

Capital Cost

TOTAL PROJECT COST$5,636,000

Overview

Department
Streets
Project Number
PWSTR-26-002
Type
Improvement
Category
Urbanization
Priority
2 Very Important
Status
Active
Useful Life
25 years
Paser Rating:
3
Project Length (mi.):
0.50
  • Street Urbanization - $2,820,000 (50.0%)
  • Storm - Sanitary District No. 3 - $1,505,000 (26.7%)
  • Water - Sanitary District No. 1 - $1,017,000 (18.0%)
  • Engineering Streets - $234,000 (4.2%)
  • Sewer - Sanitary District No. 2 - $60,000 (1.1%)
Budget Items
Budget Items20272029Total
Engineering Streets234,0000234,000
Sewer - Sanitary District No. 2060,00060,000
Storm - Sanitary District No. 3280,0001,225,0001,505,000
Street Urbanization02,820,0002,820,000
Water - Sanitary District No. 142,000975,0001,017,000
Total556,0005,080,0005,636,000

Project Description

Capitol Dr (Bluemound-Lynndale) will be urbanized with a 5' sidewalk along the south side of the roadway, curb and gutter and storm sewer.  Capitol Dr (Capitol Frontage Rd-Bluemound) will be pulverized and paved with on-street bicycle lanes.

Project Justification

Pavement is in poor condition.  The roadway also does not include bicycle and pedestrian facilities and is identified in the Bicycle and Pedestrian Strategy to include these facilities.

Spend

Budget Utilization
$5,636,000 of $5,636,000 Actual Spent100%
  • Construction - $5,080,000 (90.1%)
  • Engineering - $306,000 (5.4%)
  • Land/ROW Acquisition - $250,000 (4.4%)
Expenditures
Expenditures20272029Total
Construction05,080,0005,080,000
Engineering306,0000306,000
Land/ROW Acquisition250,0000250,000
Total556,0005,080,0005,636,000
  • General Obligation Debt - $3,054,000 (54.2%)
  • San 3 Fund Balance - $1,505,000 (26.7%)
  • San 1 Debt - $1,017,000 (18.0%)
  • SAN 2 Debt - $60,000 (1.1%)
Funding Sources
Funding Sources20272029Total
General Obligation Debt234,0002,820,0003,054,000
San 1 Debt42,000975,0001,017,000
SAN 2 Debt060,00060,000
San 3 Fund Balance280,0001,225,0001,505,000
Total556,0005,080,0005,636,000