Capital Cost
TOTAL PROJECT COST$2,637,000
Overview
- Department
- Sanitary District 1 - Water
- Project Number
- PWS1-26-002
- Type
- Improvement
- Category
- Water
- Priority
- 1 Critical
- Status
- Active
- Useful Life
- 75 years
- Water - Sanitary District No. 1 - $1,780,000 (67.5%)
- Street Overlays/Reclamations - $735,000 (27.9%)
- Engineering Streets - $46,000 (1.7%)
- Sewer - Sanitary District No. 2 - $46,000 (1.7%)
- Storm - Sanitary District No. 3 - $30,000 (1.1%)
| Budget Items | 2029 | 2030 | Total |
|---|---|---|---|
| Engineering Streets | 46,000 | 0 | 46,000 |
| Sewer - Sanitary District No. 2 | 0 | 46,000 | 46,000 |
| Storm - Sanitary District No. 3 | 0 | 30,000 | 30,000 |
| Street Overlays/ | 0 | 735,000 | 735,000 |
| Water - Sanitary District No. 1 | 132,000 | 1,648,000 | 1,780,000 |
| Total | 178,000 | 2,459,000 | 2,637,000 |
Project Justification
Corrosive soils have deteriorated the existing ductile iron water main, which was installed in approximately year 1975. The Town desires to reduce water loss associated with leaks and water main breaks. Both leaks and breaks contribute to water loss in the Town.
Project Description
Replacement of existing water main along W Elberg Ave (1,000 S of Wisconsin-N Hickory Farm), N Hickory Farm Ln (Wisconsin-Packard), and W Packard St (Hickory Farm-Lynndale). Existing sanitary sewer will be televised and reviewed for any repairs required. Roadway will be pulverized and repaved.
Spend
Budget Utilization
$2,637,000 of $2,637,000 Actual Spent100%
- Construction - $2,459,000 (93.2%)
- Engineering - $178,000 (6.8%)
| Expenditures | 2029 | 2030 | Total |
|---|---|---|---|
| Construction | 0 | 2,459,000 | 2,459,000 |
| Engineering | 178,000 | 0 | 178,000 |
| Total | 178,000 | 2,459,000 | 2,637,000 |
- San 1 Debt - $1,780,000 (67.5%)
- General Obligation Debt - $781,000 (29.6%)
- San 2 Fund Balance - $46,000 (1.7%)
- San 3 Fund Balance - $30,000 (1.1%)
| Funding Sources | 2029 | 2030 | Total |
|---|---|---|---|
| General Obligation Debt | 46,000 | 735,000 | 781,000 |
| San 1 Debt | 132,000 | 1,648,000 | 1,780,000 |
| San 2 Fund Balance | 0 | 46,000 | 46,000 |
| San 3 Fund Balance | 0 | 30,000 | 30,000 |
| Total | 178,000 | 2,459,000 | 2,637,000 |