Grand Chute, WisconsinGrand Chute, Wisconsin

W Elberg Ave/N Hickory Farm Dr/W Packard St Relay

Share your feedback

Do you have thoughts or questions about W Elberg Ave/N Hickory Farm Dr/W Packard St Relay? Your feedback goes directly to Grand Chute, Wisconsin staff — it is never posted on this website.

Capital Cost

TOTAL PROJECT COST$2,637,000

Overview

Department
Sanitary District 1 - Water
Project Number
PWS1-26-002
Type
Improvement
Category
Water
Priority
1 Critical
Status
Active
Useful Life
75 years
  • Water - Sanitary District No. 1 - $1,780,000 (67.5%)
  • Street Overlays/Reclamations - $735,000 (27.9%)
  • Engineering Streets - $46,000 (1.7%)
  • Sewer - Sanitary District No. 2 - $46,000 (1.7%)
  • Storm - Sanitary District No. 3 - $30,000 (1.1%)
Budget Items
Budget Items20292030Total
Engineering Streets46,000046,000
Sewer - Sanitary District No. 2046,00046,000
Storm - Sanitary District No. 3030,00030,000
Street Overlays/Reclamations0735,000735,000
Water - Sanitary District No. 1132,0001,648,0001,780,000
Total178,0002,459,0002,637,000

Project Justification

Corrosive soils have deteriorated the existing ductile iron water main, which was installed in approximately year 1975. The Town desires to reduce water loss associated with leaks and water main breaks. Both leaks and breaks contribute to water loss in the Town.

Project Description

Replacement of existing water main along W Elberg Ave (1,000 S of Wisconsin-N Hickory Farm), N Hickory Farm Ln (Wisconsin-Packard), and W Packard St (Hickory Farm-Lynndale).  Existing sanitary sewer will be televised and reviewed for any repairs required.  Roadway will be pulverized and repaved.

Spend

Budget Utilization
$2,637,000 of $2,637,000 Actual Spent100%
  • Construction - $2,459,000 (93.2%)
  • Engineering - $178,000 (6.8%)
Expenditures
Expenditures20292030Total
Construction02,459,0002,459,000
Engineering178,0000178,000
Total178,0002,459,0002,637,000
  • San 1 Debt - $1,780,000 (67.5%)
  • General Obligation Debt - $781,000 (29.6%)
  • San 2 Fund Balance - $46,000 (1.7%)
  • San 3 Fund Balance - $30,000 (1.1%)
Funding Sources
Funding Sources20292030Total
General Obligation Debt46,000735,000781,000
San 1 Debt132,0001,648,0001,780,000
San 2 Fund Balance046,00046,000
San 3 Fund Balance030,00030,000
Total178,0002,459,0002,637,000