Share your feedback
Do you have thoughts or questions about W First Ave Reclaim/Pave (Bluemound-Lynndale)? Your feedback goes directly to Grand Chute, Wisconsin staff — it is never posted on this website.
Capital Cost
Overview
- Department
- Streets
- Project Number
- PWSTR-27-006
- Type
- Improvement
- Category
- Reconstruction
- Priority
- 2 Very Important
- Status
- Active
- Useful Life
- 20 years years
- Paser Rating:
- 3
- Project Length (mi.):
- 0.20
| Budget Items | 2031 | Total |
|---|---|---|
| Engineering Streets | 74,000 | 74,000 |
| Total | 74,000 | 74,000 |
Project Description
W First Ave (Bluemound Dr-Lynndale Dr) will be reclaimed and paved. Isolated ditch improvements will be evaluated and improved where necessary. Culverts will be reviewed and replaced if needed. Water main hardware and bolts to be replaced on tees and valves. Hydrants and copper services to be replaced. Sanitary manhole to be adjusted to final grade.
Project Justification
Pavement is in poor condition and is beginning to deteriorate. Existing water main was likely installed without stainless steel hardware and bolts, as well as having copper services that have a history of corroding.
Spend
| Expenditures | 2031 | Total | Future |
|---|---|---|---|
| Engineering | 74,000 | 74,000 | 1,680,000 |
| Total | 74,000 | 74,000 |
| Funding Sources | 2031 | Total | Future |
|---|---|---|---|
| General Obligation Debt | 74,000 | 74,000 | 1,680,000 |
| Total | 74,000 | 74,000 |