W Golf Terrace Ct Reclaim/Pave

Powered by PlanIt!

Capital Cost

TOTAL PROJECT COST$102,000

Overview

DepartmentStreets
Project NumberPWSTR-25-013
TypeImprovement
CategoryReclamation
Priority3 Important
StatusActive
Useful Life20 years
Budget Items20262027Total
Engineering Streets7,00007,000
Sewer - Sanitary District No. 202,3002,300
Storm - Sanitary District No. 3026,00026,000
Street Overlays/Reclamations060,60060,600
Water - Sanitary District No. 106,1006,100
Total7,00095,000102,000

Project Description

W Golf Terrace Ct (S Westland Dr-Termini) will be reclaimed and paved.  Ditch improvements will be evaluated and improved. Water main hardware to be replaced if in poor condition. Sanitary manhole to be adjusted to final grade. Culverts will be replaced as part of the ditch regrading.

Project Justification

Roadway surface is deteriorating and is past pavement maintenance/preservation methods.  Ditches have been filled in previous years causing drainage issues along the roadway.  Ditches will be reestablished and culverts will be reset to allow for proper drainage.  Project will include replacement of bolts for water valves and hydrants.

Spend

Expenditures20262027Total
Construction095,00095,000
Engineering7,00007,000
Total7,00095,000102,000
Funding Sources20262027Total
General Obligation Debt 20267,00007,000
General Obligation Debt 2028060,60060,600
San 1 Debt06,1006,100
San 2 Fund Balance02,3002,300
San 3 Fund Balance026,00026,000
Total7,00095,000102,000