Capital Cost

TOTAL PROJECT COST$3,936,000

Overview

Department
Sanitary District 1 - Water
Project Number
PWS1-25-001
Type
Improvement
Category
Water
Priority
2 Very Important
Status
Active
Useful Life
75 years
  • Water - Sanitary District No. 1 - $3,240,000 (82.8%)
  • Sewer - Sanitary District No. 2 - $675,000 (17.2%)
Budget Items
Budget Items2027Total
Sewer - Sanitary District No. 2675,000675,000
Water - Sanitary District No. 13,240,0003,240,000
Total3,915,0003,915,000

Project Description

Continuation of the Wisconsin Ave Utility replacement project.  This section is located along the south side of Wisconsin Ave between Bluemound Dr and Badger Ave.

GCSD 1 - Replace the existing water main, hydrants, and water services.

GCSD 2 - Replace or rehabilitate the existing sanitary sewer and lateral connections.

Project Justification

Corrosive soils have deteriorated the existing ductile iron water main, which was installed in approximately year 1975. The Town desires to reduce water loss associated with leaks and water main breaks. Both leaks and breaks contribute to water loss in the Town.

Based on televising, the existing sanitary sewers have leaks and other deformities. The existing sanitary sewers were installed in approximately year 1967.

Spend

Budget Utilization
$3,740,000 of $3,740,000 Actual Spent100%
Expenditures
PriorExpenditures2027Total
196,000Construction3,740,0003,740,000
Total3,740,0003,740,000
  • San 1 Debt - $3,240,000 (86.6%)
  • San 2 Fund Balance - $500,000 (13.4%)
Funding Sources
PriorFunding Sources2027Total
196,000San 1 Debt3,240,0003,240,000
San 2 Fund Balance500,000500,000
Total3,740,0003,740,000